Explained: The Rs 705 crore grand plan to redevelop the 18th-Century Mahakaleshwar temple in Ujjain
Abdul Gh Lone 30 September 2022 0 COMMENTSThe ancient Mahakaleshwar temple in Madhya Pradesh’s Ujjain is getting a big makeover. The first phase of the redevelopment plan is over and Prime Minister Narendra Modi will inaugurate the Mahakaleshwar Corridor on 11 October.
The story of the temple
Mahakaleshwar temple houses one of 12 jyotirlingas, considered the most sacred of Lord Shiva’s shrines. It is located in the ancient city of Ujjain alongside the holy river Kshipra.
According to Hindu mythology, the temple was built by Lord Brahma. The Mahakal lingam is believed to be swayambhu (self-manifested) and the idol of Mahakaleshwar is said to be dakshinmukhi (facing the south), a feature found only in this temple.
The temple is also one of the 18 Maha Shakti Peeths – shrines which have the presence of Shakti because some part of the corpse of Sati Devi fell there. The upper lip of the devi is said to be in this holy place and the Shakti is called Mahakali, according to Hindu mythology.
The temple in its present form was built by the Maratha general Ranoji Shinde in 1734 CE.
The plan for the temple revamp
In 2017, the Madhya Pradesh government announced the plan to expand and beautify the Mahakal complex that houses the temple and its adjoining areas.
The temple complex which is spread across two and a half hectares will be expanded to more than 40 hectares and this includes Rudrasagar lake. The redevelopment plan is expected to cost Rs 705 crore.
The Mahakal Maharaj Mandir Parisar Vistar Yojna, as the project is called, is being undertaken in two phases and is expected to increase footfall in the city from 1.50 crore to three crore, reports The Indian Express.
The first phase of the project is now completed.
Also read: 5,000 hectares, Rs 399 cr: What the Kashi Vishwanath Corridor Project entails in numbers
The Mahakaleshwar Corridor
PM Modi will inaugurate the first phase of the Mahakaleshwar Corridor, which has been constructed at the cost of Rs 350 crore.
The newly constructed corridor will be called will be known as Mahakal Lok, CM Chouhan announced on Tuesday after the first-ever Cabinet meeting in Ujjain.
The first phase of the project includes the redevelopment of the Mahakal temple campus, facelift of the Rudrasagar lake including a bridge, development of Rudrasagar banks, Mahakaleshwar Vatika, Dharmshala, ann kshetra (food hall), preaching hall and a lotus pond.
The temple area will be increased by almost eight times the earlier one once the project is completed.
As part of infrastructure development, the entry and exit points for visitors to the temple have been made hassle-free, the access routes to the complex have been bifurcated, and parking lots have been revamped. Ticketing kiosks have been made for visitors at the entry plaza.

A pedestrian corridor has been constructed to connect the entrance to the temple complex. This area has been dotted with statues and murals depicting stories of Lord Shiva, according to The Indian Express. There are eateries and shopping stores along this route.
The congested nearby markets have been dismantled and shopkeepers are designated commercial areas to carry on with their business.
Coming soon in the second phase
The second phase is expected to be completed by June 2023 and will cost another Rs 300-odd crore.
The second phase includes tourism information centres, Chhota Rudrasagar lakefront, development of Mahakal entrance gate and ancient routes, widening of Hari Fatak bridge and railway underpasses, foot over bridge on Rudrasagar, upgradation of Mahakal temple access routes, reports News18.

Areas around Ujjain will be revamped. A dharmshala and a Kumbh museum will be part of the plan, according to The Indian Express report.
Heritage places near the complex will also get a facelift while keeping the heritage site intact.
Under Amrit Yojana, an underground sewer system is being developed so that drain water isn’t discharged into River Kshipra or Rudrasagar.
The politics over the plan
At the Cabinet meeting held in Ujjain on Tuesday, the Madhya Pradesh CM ceded his seat to Lord Mahakal’s portrait. Chouhan said that tenders were invited to start the first phase of the project during his earlier tenure but work was stalled because of the change in government. “… we visited Ujjain in 2020 and reviewed the work in detail,” he said.
According to the CM, the project was conceptualised for Rs 95 crore in 2017 but when the Congress government came to power in 2018, no progress was made.
However, the MP Congress president Kamal Nath said that his government allocated Rs 300 crore for the Mahakal temple and set up a committee to execute the plan in time.
With inputs from agencies
Read all the Latest News, Trending News, Cricket News, Bollywood News,
India News and Entertainment News here. Follow us on Facebook, Twitter and Instagram.
RELATED ARTICLES
Ad
Recent Posts
- Pakistan Army will continue to play role in ensuring peace, stability in KP: COAS 27 September 2023
- India plans to import next batch of cheetahs from Northern Africa 27 September 2023
- Australia in India: Glenn Maxwell stars as visitors win third ODI to end losing streak 27 September 2023
- Digital transactions sustained growth during FY22-23: SBP 27 September 2023
- PPP forms legal team to challenge new delimitations 27 September 2023
Old Archives
- September 2023
- August 2023
- July 2023
- June 2023
- May 2023
- April 2023
- March 2023
- February 2023
- January 2023
- December 2022
- November 2022
- October 2022
- September 2022
- August 2022
- July 2022
- June 2022
- May 2022
- April 2022
- March 2022
- February 2022
- January 2022
- December 2021
- November 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- May 2020
- April 2020
- March 2020
- February 2020
- January 2020
- December 2019
- November 2019
- October 2019
- September 2019
- August 2019
- July 2019
- June 2019
- May 2019
- April 2019
- March 2019
- February 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- August 2018
- July 2018